Graham Greene Quote
We most of us hesitate to make so complete a statement - we remember and we foresee and we doubt. She had no doubts. The moment only mattered. Eternity is said not to be an extension of time but an absence of time, and sometimes it seemed to me that her abandonment touched that strange mathematical point of endlessness, a point with no width, occupying no space. What did time matter - all the past and the other men she may from time to time (there is that word again) have known, or all the future in which she might be making the same statement with the same sense of truth? When I replied that I loved her too in that way, I was the liar, not she, for I never lose the consciousness of time: to me the present is never here: it is always last year or next week.
We most of us hesitate to make so complete a statement - we remember and we foresee and we doubt. She had no doubts. The moment only mattered. Eternity is said not to be an extension of time but an absence of time, and sometimes it seemed to me that her abandonment touched that strange mathematical point of endlessness, a point with no width, occupying no space. What did time matter - all the past and the other men she may from time to time (there is that word again) have known, or all the future in which she might be making the same statement with the same sense of truth? When I replied that I loved her too in that way, I was the liar, not she, for I never lose the consciousness of time: to me the present is never here: it is always last year or next week.
Related Quotes
About Graham Greene
Combining literary acclaim with widespread popularity, Greene acquired a reputation early in his lifetime as a major writer, both of serious Catholic novels, and of thrillers (or "entertainments" as he termed them). He was shortlisted for the Nobel Prize in Literature several times. Through 67 years of writing, which included over 25 novels, he explored the conflicting moral and political issues of the modern world. The Power and the Glory won the 1941 Hawthornden Prize and The Heart of the Matter won the 1948 James Tait Black Memorial Prize and was shortlisted for the Best of the James Tait Black. Greene was awarded the 1968 Shakespeare Prize and the 1981 Jerusalem Prize. Several of his stories have been filmed, some more than once, and he collaborated with filmmaker Carol Reed on The Fallen Idol (1948) and The Third Man (1949).
He converted to Catholicism in 1926 after meeting his future wife, Vivien Dayrell-Browning. Later in life he took to calling himself a "Catholic agnostic".
He died in 1991, aged 86, of leukemia, and was buried in Corseaux cemetery in Switzerland. William Golding called Greene "the ultimate chronicler of twentieth-century man's consciousness and anxiety". V. S. Pritchett called him "The most ingenious, inventive and exciting of our novelists, rich in exactly etched and moving portraits of real human beings and who understands the tragic and comic ironies of love, loyalty and belief."